Dive
Operations |
|
|
Underwater Survey |
|
|
|
Types of Inspections:
- Verbal Report
- Photographic Report
- CCTV or Video
Types of Inspections:
- General – no cleaning, quick
- Close – pre-cleaned, slow and methodical
|
 |
 |
|
|
|
|
Marine
Civil Construction |
|
|
|
-
Jetty Construction
-
Air Lifting
-
Sand Spreading
-
Underwater Concrete Installation
-
Dredging
-
Concrete piling
-
Underwater cutting and welding
-
Structure repairs, etc.
|
 |
 |
|
|
|
|
Ship Hasbandry |
|
|
|
-
Anode replacement
-
Propeller maintenance
-
Sea intake repair, etc.
|
 |
 |
|
|
|
|
Underwater Welding &
Cutting |
|
|
|
List of types of work areas:
-
Pipelines and Structures
-
Pile and Non-Ferous Metal Cutting
|
 |
 |
|
|
|
|
Confined Space Entry &
Dredging |
|
|
|
Usually necessary when confined water holding spaces need to be
surveyed, repaired or cleared from silt.
Examples of confined spaces:
Water reservoirs and small dams
Dangerous / toxic chemical sumps
Waste water works
|
 |
 |
|
|
|
|
In Water Dam wall & Sluice
Gate Repairs |
|
|
|
Diving operations conducted at dams in order to repair or survey dam
wall structures, sluices, pumps and sluice gates |
 |
 |
|
|
|
|
Salvaging |
|
|
|
The recovery of sunken vehicles, ships, aeroplanes, etc. utilising
underwater search methods and lifting devices such as air lift bags
and cranes
|
 |
 |
|
|
|
|
|
|
|
|
Harbour Construction &
Clearing |
|
|
|
The construction, cleaning, development, and repair of mooring spaces
for various types of water transport.
|
 |
 |
|
|
|
|
Air Jetting |
|
|
|
Removing underwater obstacles / marine growth utilising a high
pressure burst of air targeted onto the area of concern
|
 |
 |
|
|
|
|
Pumping & Dredging |
|
|
|
-
Removal of silt and nibble via various types of pumps and hoses
-
Usually done to clear an obstruction in the water flow caused by the
silt, or to reach an underwater dive work site obstructed by the
silt and rubble
-
Is also used in the underwater mining industry when mining for
precious stones and minerals. |
 |
 |
|
|
|
|
|
|
|
|